Do Ngoc, A., Dias, D. . and Trong Dang, T. (2021) “A numerical investigation of the impact of shield machine’s operation parameters on the settlements above twin stacked tunnels - A case study of Ho Chi Minh urban railway Line 1”, Vietnam Journal of Earth Sciences, 43(4), pp. 409–423. doi: 10.15625/2615-9783/16442.